Jan 2006 (approved)
May 2007 (approved)
Appendix
- 1058.08.013 Appendix 4 SITE INVESTIGATION
- 1058.08.014 Appendix 5 archaeology
- 1058.08.015 Appendix 6 ecology
- 1058.08.016 Appendix 7 hard and soft landscape details
- 1058.08.017 Appendix 8 boundary treatments
- 1058.08.018 Appendix 9 Pond construction
- Bats Ditton, Widnes text AmecEdit
- Contamination Assessment Ditton Rail Freight
- Ditton Rail Freight Phase I Habitat Report
- Ecology Assessment Ditton QA Version 14.12.05
- Ecology surveys 2006 with map
- Figs 1-18
- Figs 19-37
- Report
Drawings
- C1058.08.001 Planning context
- D1058.08.001C Site layout plan Layout1
- D1058.08.002A Earthworks plan Layout1
- D1058.08.007C Planting plan
- D1058.08.011 Post and wire
- D1058.08.012 Vertical Head
- D1058.08.013 Close Board F
- D1058.08.014B Boundary treatments
- D1058.08.016 Vertical Inle
- D1058.08.017 A Frame Gate
- D1058.08.018 Rabbit proof
- D1058.08.019 Three rail fence
- D1058.08.022 Tarmac footpath
- D1058.08.023 Manhole type A and B
- D1058.08.024 Catchpit sump
- D1058.08.025 Planning Application and land ownership boundar
- D1058.08.026 Phasing Plan
O’Connor Group
- 2007application
- 5181-PA001 Existing Site Plan June 07 A1
- 5181-PA002 Proposed Site Plan Custom
- 5181-PA003 Proposed Building Plots A1
- 5181-PA004 Workshop Unit Projects A1 Block
- 5181-PA005 HQ Plot and Access A1
- 5181-PA006 Gate House Projects A1 Block
- Covering Letter
- Design and Access Statement
- Planning Application Form and Ownership Certificate
- PR-002
- PR-003
- PR-004altb
- PR-005altc
Rail Sidings
Stobart applications
- 01-11-07 Consultation Statement
- 01-11-07 Design Access statement
- 01-11-07 Planning Statement
- 14-11-07 Amendments Letter
- 751.01D
- 06026_WP01a _main siteplan
- 06026_WP03_ELES 06026_WP04_sections-FIN
- 06026_WP05 unit 2 SITE – fin
- 06026_WP06_REHAU eles
- 06026_WP07_site sections
- 06026_WP10_Goods Out Elevs-FIN
- 06026_WP11_Goods In Elevs-FIN
- 06026_WP12_Battery Charge Elevs-FIN
- 06026_WP13_MHE Elevs-fin
- 06026_WP15_Roof Plan-fin
- 06026_WP16_Fence Details-FIN
- 06026_WP17_site location plan – fin
- 73390-02-RevA
- Certificate C
- Owners Addresses
- WGL ES Non Technical Summary _FINAL_ Addendum
- WGL ES S01 – Introduction _FINAL_
- WGL ES S02 – Existing Site Description _FINAL_
- WGL ES S03 – Proposed Development _FINAL_
- WGL ES S04 – Assessment Methodology _FINAL_
- WGL ES S05 – Planning Policy Framework _FINAL_
- WGL ES S06 – Archaeology and Cultural Heritage _FINAL_ with
- WGL ES S07 – Air Quality Climate _ FINAL_ Addendum
- WGL ES S08 – COMAH Risk Assessment _FINAL_ Oct 07
- WGL ES S09 – Ecology Nature Conservation _FINAL_
- WGL ES S10 – Landscape and Visual Character _FINAL_
- WGL ES S11 – Night Light _FINAL_
- WGL ES S12 – Noise and Vibration _FINAL_ Addendum
- WGL ES S13 – SocioEconomic _FINAL_
- WGL ES S14 – Soils Geology and Contamination
- WGL ES S15 – Sustainability _FINAL_
- WGL ES S16 – Traffic and Transport _FINAL_
- WGL ES S17 – Water Quality and Hydrology _FINAL_
- WGL ES S18 – Waste Management _FINAL_ Oct 07
- WGL ES S19 – Conclusions _FINAL_
- WGL ES S19 Conclusions Table _FINAL_
Stobart applications 2008
- 0092 pl00501c-00501Rev-B
- 0093 08011_P01_site loc plan
- 0094 08011_P02_Phase 1 Site Plan
- 0095 08011_P03_Phase 2 Site Plan
- 0096 08011_P04_PH1 floorplan
- 0097 08011_P05_PH2 floorplan
- 0098 08011_P06_elevations
- 0099 08011_P07_Building Sections
- 0100 08011_P08 – Warehouse roof plan
- 0101 08011_P09 – RSU Ground floor plan
- 0102 08011_P10 – RSU – Elevations
- 0103 08011_P11 – RSU – Sections
- 0104 08011_P12 – RSU – Roofplan
- 0105 08011_P13_VMU- Layouts
- 0106 08011_P14 – VMU elevations
- 0107 08011_P15 – VMU sections
- 0108 08011_P16_VMU- roof plan
Appendix
- Appendix 1 – Design and Access Statement
- Appendix 2 – a Phase 1 Habitat Survey – Project Eagle
- Appendix 2_ Annex D Photographic Plates
- Appendix 2_ b Annex A Figure 1_Widnes
- Appendix 2_ c Annex A Figure 2_Widnes
- Appendix 2_ d Annex A Fig3 Habitat Map
- Appendix 3 – Nesting Bird Survey
- Appendix 4 – FRA
- Appendix 4 – FRA Figure 1.1 Site Location
- Appendix 4 – FRA Figure 1.2 Site Areas
- Appendix 4 – FRA Figure 1.3 Proposed Steward’s Brook Divers
- Appendix 4 – FRA Figure 2.1 Topographic Survey (A0)
- Appendix 4 – FRA Figure 2.2 EA Flood Map
- Appendix 5 – Site Remediation Strategy
- Appendix 6 – HBC-3MG re former playing field
- Appendix 7 Transport Statement Part 1
- Appendix 7 Transport Statement Part 2
Stobart applications 2009
Planning applications 2011
Stobart Application July 2011 – Land remediation and construction of new storage and distribution buildings
https://webapp.halton.gov.uk/planningapps/ShowCaseData.asp?CaseNo=11/00266/OUTEIA
Stobart Application July 2011 – Proposed office development and car parking
https://webapp.halton.gov.uk/planningapps/ShowCaseData.asp?CaseNo=11/00267/OUT
Prologis Application July 2011 – construction of a single rail-served building for storage and distribution purposes
https://webapp.halton.gov.uk/planningapps/ShowCaseData.asp?CaseNo=11/00269/FULEIA
Planning applications 2012
Proposed development and erection of a wood fuelled Biomass Combined Heat and Power Plant and ancillary infrastructure development
https://webapp.halton.gov.uk/planningapps/ShowCaseData.asp?CaseNo=12/00458/FULEIA
HBC planning policy
HBC Planning policy information can be found at: www.halton.gov.uk/planningpolicy